Project Details
Abonmarche provided design and construction services for the installation of a 4,800 linear foot, 72-inch diameter storm sewer from the St. Joseph River to Clyde Creek. The new trunk sewer was installed under existing city streets, State Road 933, and the Norfolk Southern Railroad (Chicago, Illinois to Cleveland, Ohio) tracks. This sewer provided re-routing of storm water from a combined sewer overflow that discharged to the St. Joseph River. Abonmarche provided the project management, field surveying, restoration design of the existing street rights-of-way, INDOT permitting, railroad permitting, easement acquisition documents, maintenance of traffic design, and construction inspection.
Highlights
- 72” Storm Sewer
- Railroad Crossing
- River Outfall